Camel Build
Flooring Services
Everything that you dreamed of can be brought to life exactly at the moment when you decide to win.

Why homeowners trust our remodeling crews

  • Licensed & permittedEvery draw pulled through the city
  • Fully insured$2M liability, workers’ comp on crew
  • 5-year warrantyWorkmanship covered in writing
  • On-calendar buildsWeekly schedule you can hold us to

What we remodel

Five kinds of home remodeling projects, run by the same in-house team from first sketch to punch list. Every scope below includes design drawings, permits, materials, daily site protection and cleanup.

  • Remodeled kitchen with a large island and new cabinetry

    Kitchen remodeling

    Layout changes, custom cabinetry, stone counters, lighting, flooring and appliance integration — engineered so the room still works when three people are in it at once.

    • Island layouts
    • Custom millwork
    • Structural openings
  • Bathroom remodel with walk-in shower and large format tile

    Bathroom remodeling

    Wet-room conversions, curbless showers, heated floors and full re-pipes, waterproofed to manufacturer spec and signed off before tile goes on.

    • Curbless showers
    • Double vanities
  • Home addition under construction beside an existing house

    Additions & expansions

    Second stories, bump-outs and primary-suite additions engineered to match the existing structure.

  • Finished basement turned into a family room

    Basement finishing

    Moisture control, egress, framing, drywall and lighting — plus media rooms, guest suites and home offices.

  • House exterior after a whole-home remodeling project

    Whole-home remodeling

    Phased renovations of occupied houses: one plan, one crew, one schedule, room by room.

How a home remodeling project runs

Four stages, one project manager, no hand-offs to strangers. You know what happens next at every point between the first walkthrough and the keys.

  1. Walkthrough & fixed proposal

    We measure the house, listen to how you use it, and return an itemized scope with a fixed price and a start window — usually within five business days.

  2. Design & selections

    Drawings, structural review, finishes and appliances picked in our studio. Permits filed by us; nothing starts until the price and schedule are signed.

  3. Build & weekly updates

    One dedicated crew, dust barriers, daily cleanup and a Friday report with photos, next week’s schedule and any decisions we need from you.

  4. Walkthrough & warranty

    We walk the punch list together, close every item, then hand over manuals, paint codes and a 5-year workmanship warranty in writing.

Typical timeline: 6–14 weeks on site after design sign-off Occupied homes: we stage the work so you keep a kitchen and a bathroom

What home remodeling costs

Real numbers from projects we completed in the last eighteen months, so you can budget before we ever set a walkthrough.

Carpenter measuring framing during a home remodeling project

Every estimate is measured on site — never square-foot guesswork.

  • Kitchen remodeling Cabinetry, counters, lighting, flooring, appliances, minor layout changes $45k – $95k8–12 weeks on site
  • Bathroom remodeling Full gut, waterproofing, tile, fixtures, ventilation, re-pipe $22k – $52k4–7 weeks on site
  • Basement finishing Moisture control, framing, egress, drywall, lighting, flooring $40k – $85k7–11 weeks on site
  • Room addition Foundation, framing, roof tie-in, mechanicals, finishes $95k – $190k14–22 weeks on site
  • Whole-home remodeling Phased, multi-room renovation of an occupied house from $150k4–7 months on site

How pricing works: ranges above cover construction, labor and permits. Finishes are chosen at the allowance level you set, and your final contract price is fixed before demolition — if we miss something in our own scope, we absorb it.

They gutted the kitchen and both bathrooms while we kept living in the house. Every Friday we got photos, a schedule and a real answer — and the final invoice was the number we signed in March.

Dana & Marcus R. Whole-home remodel · 1,900 sq ft 4.9 average from 132 verified reviews

Home remodeling questions, answered

The questions we hear most often on the first call — with straight answers about cost, timing and living through the work.

Ask us something specific →
How much does home remodeling cost?

It depends on scope, but recent projects landed at $45k–$95k for kitchens, $22k–$52k for bathrooms, $40k–$85k for basements and from $95k for additions. After the walkthrough we produce an itemized, fixed-price proposal — no per-square-foot estimates, no moving targets once the contract is signed.

How long does a home remodeling project take?

Design and permitting usually take 3–6 weeks; on-site work runs 4 weeks for a bathroom up to 7 months for a whole-home renovation. Your proposal includes a start window and a week-by-week schedule, and we update it every Friday.

Do I need permits for my remodel?

Almost always — structural changes, electrical, plumbing, windows and additions all require them. We draw the plans, file the permit and schedule inspections as part of the contract, so nothing on your project is unpermitted work.

Can we stay in the house during construction?

For most kitchens, bathrooms and basements, yes. We seal off the work zone with dust barriers, run a temporary hand-wash station when the kitchen is offline, and keep one usable bathroom at all times. Whole-home projects are staged room by room so you always have a livable core.

Do you handle design and finish selection?

Yes — design-build is one contract. We produce layout drawings, 3D views where it helps, and a selections sheet you fill at our studio or remotely. Structural engineering is coordinated by us before anything is ordered.

What does the warranty cover?

Five years on our workmanship — framing, tile, trim, cabinetry installation — plus whatever manufacturer warranties come with your fixtures and appliances. If something we built needs attention, we come back and fix it.

Get a fixed-price remodeling proposal

Tell us what you want to change. We’ll call within one business day to book a 45-minute walkthrough — no cost, no obligation, no pressure to sign on the spot.

  • You send the detailsRoom, scope and roughly when you’d like to start.
  • We walk the houseMeasured, photographed and answered on the spot where we can.
  • You get the proposalItemized scope, fixed price and a start window in five business days.

Call (555) 014-2200 hello@oaklineremodeling.com

Request your estimate

Fields marked as required help us quote accurately the first time.

We only use these details to prepare your estimate. No lists, no spam.

Made on
Tilda